Upon request, VOCZero’s specialists can be dispatched to the customer’s site to supervise the installation of VOC vapor treatment systems.
During this critical phase of the project, supervision includes the installation of equipment on the prepared foundation, the integration of the VOC vapor treatment system with battery-limit interfaces, and the loading of activated carbon into the vessels in preparation for the next stage – the commissioning of the VOC vapor treatment system.